Open pit

Open pit protection – Roxanich Heritage Wine Hotel and wine cellar

Open pit protection – Roxanich Heritage Wine Hotel and wine cellar

May 30, 2019

At the site of the old cooperative cellar, built in 1902, at the foothill of the Istrian town Motovun, design for the construction of Roxanich Heritage Wine Hotel and the 5-stage wine cellar was launched. For the purpose of construction, geotechnical exploration and investigation works consisting of exploratory drilling, excavation of probing pit, engineering-geological terrain […]

Open pit protection – Tobacco Factory Rovinj

Open pit protection – Tobacco Factory Rovinj

May 30, 2019

In the central part of Istria, Kanfanar Municipality, there is a Tobacco factory Rovinj on a total area of 45,000 square meters. For the reconstruction and extension of the hall, the geotechnical exploration and investigation works were executed. For the purpose of the open pit protection, we made the main and detailed design. Based on […]

Open pit protection – MP Projekt, Opatija

Open pit protection – MP Projekt, Opatija

August 28, 2018

For business / residential building with swimming pool and retaining walls, we executed an open pit protection. The location of the building is located in Opatija, between the Nova Cesta and the Marshal Tito Street. Pile wall of reinforced concrete drilled piles and pit excavation were executed for the building. The excavation and open pit […]

Open pit protection – Hotel Plat, Dubrovnik

Open pit protection – Hotel Plat, Dubrovnik

July 19, 2017

The site is located in the area of today’s hotel complex Plat in Župa Dubrovacka, on the mild peninsula of Plat, on the eastern coast of the spacious bay, situated between the main road and the sea. For the construction of the new hotel Sensatori, which is being built by reconstruction of the existing Hotel […]

Open pit protection – Hotel Navis, Opatija

Open pit protection – Hotel Navis, Opatija

October 23, 2015

Hotel Navis is located in the coastal zone of Preluk cove in Opatija with an area of 800 m2. To ensure the stability during the construction and exploitation phase it was neccecary to secure an open pit with a maximum depth of 20,50 m. A main design was made on the basis of conducted geotechnical […]

Open pit protection – ZTC, Rijeka

Open pit protection – ZTC, Rijeka

October 23, 2015

Zapadni Trgovački Centar is located in the west part of the city of Rijeka with an area of 57.000 m2. To ensure the stability during the construction and exploitation phase, due to a change in technology execution and the form of the building, an open pit protection design was made. The open pit had a […]

Open pit protection – SRC Marino Cvetković, Opatija

Open pit protection – SRC Marino Cvetković, Opatija

October 23, 2015

Sport recreational center Marino Cvetković is located in the eastern part of the city of Opatija with an area of 11.000 m2. To ensure the stability during the construction and exploitation phase it was neccecary to secure an open pit with a maximum depth of 22,60 m. Provided measures included construction of a reinforced concrete beam […]